Sign in to follow this  
Draiodoir

Road work (D-20-ish) heading north from the top of the mountain.

Recommended Posts

The highway has been diverted (slightly) while roadwork is being completed heading down from the guard tower at the top of the mountain to the north.

 

The new road (which may include bridges) will replace the 20 slope highway in that area. Bridges may not go until all the local terraforming is decided on.  

 

The highway system is not interrupted and anyone wanting to find deeds for the new exploration can still find their way.

 

The detour is only 4 or 5 tiles.

Edited by Draiodoir
edit to add a letter to mountain :)
  • Like 1

Share this post


Link to post
Share on other sites

Deleted. 

Info was for temporary sharing. 

Edited by Draiodoir

Share this post


Link to post
Share on other sites
https://imgur.com/a/f1hKQT2

The highway is reconnected.  Much work to be done around it to make it look better, but the main focus was getting the highway reconnected (and bringing the underlying rock layer down (which is what took the most time, of course :)to lower my deed adjacent to this area).  There will be one more bridge put in, but the disconnect should be less than a few hours to dig the dirt/build the bridge.  There is still a small detour of the highway (5 tiles at the most) that will stay in place until it is all done.  

 

https://imgur.com/a/NRJHEGj

 

The above link to where the 3rd bridge will go in.  Flat pottery.  Lights and stuff will be added as well as some other features.  

 

My apologies to anyone who was inconvenienced by this work.  

  • Like 1

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this