Posted September 24, 2021 A Column must be started underground and finished aboveground. Graphic mid-section stretches between Cave-layer and Surface-layer. The point of this is to have a very simple, functioning and bug-fixed piece of code that links an interactive, 3D-rendered object over the 2 navigable layers, so that more ambitious structures can be code-extended in future. As a mission structure, a Ritual must be performed both underground and aboveground, at the same time. Share this post Link to post Share on other sites