Cecci

K 10 Tunnel Project - mining out the veins

Recommended Posts

20 hours ago, CalebXephrime said:

Kantinka and me just killed the 42ql iron vein. Time to move on ;)

 

Well done!

Because I'm in a generous mood today, you're allowed to expand your breaks from 4  to 6 minutes. :D 


Thorin :) 

Share this post


Link to post
Share on other sites

Down to that last vein.. ?

 

iron               93ql  4922           ( on the K10 deed).. so permissions will need to be set... means I get to something else this weekend ?

 

 

 

 

Share this post


Link to post
Share on other sites

Update II

All tiles in the tunnel which had veins removed from them are reinforced, prepared and paved.

I've also dropped catseyes through  the entire tunnel; with exception of the last 18 tiles because of permissions.

 

So with the removal of the last vein and catseyes added along the last stretch, the tunnel is done. But we need the perms for that.........

 

Thorin :) 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.