Posted September 4, 2018 How many dirts above water do I need to be to plan a building? I've tried 1, but that doesn't seem to work. (I'm underground, so experimenting is expensive.) Are adjacent tiles with far corners under water a problem? Share this post Link to post Share on other sites
Posted September 4, 2018 1 dirt above sea level should work. 1 Share this post Link to post Share on other sites
Posted September 4, 2018 (edited) I was trying to build inside a mine, abit more than 1 above water level, and it would not allow me. edit: actually I just logged in to recheck and it might have been a teensy fraction under 1 ... it was a dry reinforced tile and visually looked like more than 1, but I think now it was a hair under 1. Also had an adjacent sloped tile with far edge under water but I think i simply cut it too close to "1" (turns out the adjoining slope was 1 and the far edge was a hair underwater, I had thought that was ok since the reinforced tile was above water.. ) Edited September 4, 2018 by Brash_Endeavors 1 Share this post Link to post Share on other sites
Posted September 5, 2018 Thanks for the info! I see I have more experimenting to do. :) Share this post Link to post Share on other sites
Posted September 7, 2018 Also, the floor tiles must be reinforced in order to plan buildings and I am not sure if you get any message requiring that when trying. Too low ceiling height will block planing as well but you will get a message to that effect. =Ayes= Share this post Link to post Share on other sites