Sign in to follow this  
Tallios

Whitefay: Cleanup and Public Works

Recommended Posts

Hi there, 

 

I couldn't find anything in particular so I figured I'd start the ball rolling.  Many of the other starter deeds have been redesigned, and Whitefay has yet to be touched.

 

So I'm throwing my hat into the ring.

 

I currently have an alt, that has a deed due south of whitefay, and am working on several cleanup, and public areas.  I hope to even get approval at some point to lead, help plan, or participate in the remodel of whitefay iteself.

 

Current planed phases:

 

  1. Public Farm
  2. Public Inn
  3. Public Orchard
  4. Public Tree Farm
  5. Highway connection to Greymead.

 

More info will follow.   If you are interested in helping or donating materials/decor.  Please let me know.

  • Like 1

Share this post


Link to post
Share on other sites

Phase 1 - Public Farm

 

Status: In-progress <land shaping>

 

Currently in the Southwestern perimeter of Whitefay the construction of a public farm is being performed.

The only rules established for this farm, will be take only what you need, and always re-sow what you take.

The goal of this is to provide a wide swathe of farmland sloped gently at and 8 grade to help maximize skill gains for all persons.

 

Additionally this farm will have samples of every plot harvest-able available.

BarleyCabbageCarrotCornCottonCucumberGarlicLettuceOatOnionPea podPotato

PumpkinRyeStrawberrySugar beetTomatoWempWheat.

 

Edited by Tallios

Share this post


Link to post
Share on other sites

Phase 2 - Public Inn

 

Status: Planning

 

To build a large inn for public use for new and existing players.

 

<drawing up current plans>

Edited by Tallios

Share this post


Link to post
Share on other sites

Phase 3 - Public Orchard

 

This phase is to include the building of an orchard for public use.

 

Status: On hold <Awaiting completion of other phases>

 

Currently on hold while other projects are completed.

Edited by Tallios

Share this post


Link to post
Share on other sites

Phase 5 - Lemosa Imperial Highway

 

This phase is to build a highway to connect Greymead and Whitefay directly.

 

Status: Survey

 

Initial ground breaking in Whitefay. <2017-02-15>

 

Plans: This road will be 3 tiles wide and span over 950 tiles of distance between the two cities.  To include several bridges that will span the inner lake.

 

As of the initial ground breaking there are no deeds that conflict with this project.

 

Edited by Tallios

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this