Posted February 2, 2016 So I started a building about 4-6 weeks ago and never got to finishing the 3rd floor till today. I have 6 unfinished floor plans and several wall plans. I cut my planks and went about building the floors first. I have a habit of checking a finished floor or wall for ql once it is finished, and I was surprised to see my finished floor looking like this, [20:45:55] QL = 27.706396, dam=20.0. I am not sure if this is a feature or a bug, and have never had it happen to me before, I have left parts of buildings unfinished for weeks as I tend to hop from project to project. This is a building on deed and with extra silvers in the coffer to keep things happy. I thought it was a glitched so I built two more floors to have the same results. After that I went and destroyed all the other old floor/wall plans I had and re-planned them. Finished the next floor on a fresh plan with a finished result of 0.00 damage. Share this post Link to post Share on other sites
Posted February 2, 2016 ...I know of deeds with 9 months upkeep and things still take decay. Would love to know if unfinished buildings do not have same protections as finished structures on deeds which have been paid for. Share this post Link to post Share on other sites