Posted October 30, 2015 My friend and I are attempting to make a simple bridge but, it keeps saying that it needs to be 60 above water is there something we're doing wrong? If not that is kinda bull crap. Share this post Link to post Share on other sites
Posted October 30, 2015 (edited) Bridges length 6-8 or less require 11 dirt above water, bridges longer then that do need to be above 60 dirt. Edited October 30, 2015 by fencejumper Share this post Link to post Share on other sites
Posted October 31, 2015 My friend and I are attempting to make a simple bridge but, it keeps saying that it needs to be 60 above water is there something we're doing wrong? If not that is kinda bull crap. It has to be high enough that boats can sail under it. Share this post Link to post Share on other sites