Posted October 19, 2015 Hi all, If anyone is bored and looking for something to do -- I have permission from the GM team to work on the NE highway that runs along Y8/9. No surface mining or leveling. Just dropping dirt to get rid of the north-south slope. I'm basically turning this: Into this: The highway has 3 tiles, so all I am doing is dropping dirt so that all tiles are even with the very north one. So if you have dirt and some time, feel free to drop away If you have any questions let me know here or PM Wilca in the game. 6 Share this post Link to post Share on other sites
Posted October 19, 2015 (edited) Reserved for me to add other information such as changes of plans and such. If any Delians have suggestions I am happy to hear them. Post below or whisper in my ear, Edited October 19, 2015 by MissWilc Share this post Link to post Share on other sites
Posted October 19, 2015 Might head over to help before my prem runs out Share this post Link to post Share on other sites
Posted October 22, 2015 Kind suggestion: drop dirt on the rows next to the now steep side too, some people *cross* roads rather then follow them - and these steep-sided roads are blokkades for crossing and continuing ones path on the other side. Share this post Link to post Share on other sites
Posted October 22, 2015 (edited) Absolutely part of the plan Kianga. Sorry for the inconvenience, hopefully I'll be able to start working on those slopes this evening. EDIT: I have started working on those slopes this evening. I'm having internet connection issues so I'm not sure how much I'll be able to complete, but hopefully enough to keep from being too much of a pain when players want to cross the highway. Edited October 23, 2015 by MissWilc Share this post Link to post Share on other sites
Posted October 24, 2015 It's looking really good so far! I inadvertently found it and recognized it immediately. Very well done. Share this post Link to post Share on other sites
Posted October 26, 2015 Thanks Taki! And a general update -- the stretch of the highway starting at the east end and going to the first flat space is complete. I also worked on the slope going from the south edge of that part of the highway to make sure it is passable when walking. If I missed a spot let me know and i'll fix it. Share this post Link to post Share on other sites
Posted October 28, 2015 Had to cross it a few times today, so thank you for those less steep sides. Share this post Link to post Share on other sites
Posted October 28, 2015 Sure thing Kianga And I'm so sorry about the earlier inconvenience. Final Update (I think): I finished the highway yesterday, just waiting for a GM to check it and give final approval. Thanks to Nye and Irte for the generous dirt donations! 3 Share this post Link to post Share on other sites