Sign in to follow this  
Zekezor

Concrete Leveling quantity bug [Fixed]

Recommended Posts

While leveling with concrete it uses 1 lump per action regardless of size.

 

iow: 186kg concrete lump levels one slope and so does a 3kg one.

 

 

 

 

 

Fix: 3kg / slope height leveled

 

  • Like 1

Share this post


Link to post
Share on other sites

Sand does the same thing, a 320kg piece of sand only raises the ground 1 slope


Share this post


Link to post
Share on other sites

I supposed this is still not fixed.  I just did made this mistake.  Hope it gets fixed, or published so others can try and avoid it.

  • Like 1

Share this post


Link to post
Share on other sites
Guest
This topic is now closed to further replies.
Sign in to follow this