Sign in to follow this  
Xirith

Digging in front of bridges

Recommended Posts

What happened - I was unable to put dirt back in front of a bridge abutment that someone had removed


What I expected to happen - I expected to just put it back by dropping/flattening/levelling


Steps to reproduce - Try and drop dirt anywhere in front of the bridge to receive the message 


[07:59:56] The dirt would flow down into a structure. You are not allowed to drop dirt on structures.


 


 


OL3BJUS.jpg


Share this post


Link to post
Share on other sites

I can see this as a new way to grif bridges so maybe you should think about allowing dirt to be dropped up to the height allowed when planning.  (i know easier said than done)


Edited by Kegan

Share this post


Link to post
Share on other sites

Thank you for the report, Xirith.  I've reproduced on test and have added to the list of issues.


Share this post


Link to post
Share on other sites

So they made it so you cant dig at the end of bridges. What about people who terraformed and cant add dirt back to the end. Are we just out of luck or have to destroy and rebuild?

Share this post


Link to post
Share on other sites

So they made it so you cant dig at the end of bridges. What about people who terraformed and cant add dirt back to the end. Are we just out of luck or have to destroy and rebuild?

 

If your border tile is uneven because of the bug, use a /support in game.  Give the approx location and the name of your bridge as well.

Share this post


Link to post
Share on other sites

Ntxtreme put in a support ticket, a Arch GM should be able to fix it.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this