Sign in to follow this  
frogilla

Lake Paramount Bridge Project

Recommended Posts

After approximately:


 


8890 Brick


5940 Mortar


2696 Shards


 


I'm guessing.. I used the spreadsheet to calculate the numbers.


 


Then new bridge is complete and ready for use.


 


7ygiSRQ.jpg


  • Like 5

Share this post


Link to post
Share on other sites

May have to come back and visit the lake. Did you take out the land bridge?

Share this post


Link to post
Share on other sites

not yet.. I'll still need to dredge it but I'm taking a break first

  • Like 1

Share this post


Link to post
Share on other sites

How long did it take you to complete the bridge?

Share this post


Link to post
Share on other sites

How long did it take you to complete the bridge?

 

Probably a little over a week.. how long have bridges been in the game?

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this