Posted May 20, 2015 Hello, i have problem with bridge building.I remove all tress, fences, both ends of the bridge is 10 dirts higher than water level. No caves, rock near.14 slope down each tile. [18:24:51] You check for clearance between the bridge ends.[18:24:57] Some terrain is in the way![18:24:57] You notice that there is not enough clearance for a bridge to be built here.[18:24:57] You stop surveying.[18:24:57] You pack up the dioptra. http://i61.tinypic.com/otj0ps.png What's the matter? Share this post Link to post Share on other sites
Posted May 20, 2015 [18:24:57] Some terrain is in the way![18:24:57] You notice that there is not enough clearance for a bridge to be built here. need a hole for the bridge Share this post Link to post Share on other sites
Posted May 20, 2015 (edited) Well you have some dirt that needs lowered there is a minimum height and it was posted someplace i think but i don't know them so look around some you should find it. Edited May 20, 2015 by Kegan Share this post Link to post Share on other sites
Posted May 20, 2015 There is a difference between a bridge and a ramp unfortunately. Share this post Link to post Share on other sites
Posted May 20, 2015 The error occurs because if the bridge were made as it is, it would have to literally be right on top of the ground. You need to dig the dirt ramp down so that there would be a clearance of 10 slope between the bottom of the bridge and the dirt ground. Share this post Link to post Share on other sites
Posted May 20, 2015 Yes the bridge needs a min clearance of 10 under it on every tile. Share this post Link to post Share on other sites
Posted May 20, 2015 (edited) The minimum clearance I believe is 5 dirt I ran into this issue multiple times, you cant do a true right triangle so you need to raise the end tile a minimum of 5 dirt. As long as the end tile is at least 5 dirt higher than the lowest point under the bridge the clearance should be good. Edited May 20, 2015 by sunsvortex Share this post Link to post Share on other sites