Search the Community
Showing results for tags 'large ships'.
Found 2 results
-
This is a warning for any player planning to travel the northeast section of the Inner Sea via the Darkenstone Canal and Samling Fjord. The section of water between Rufflehome and Pest Harbour is obstructed for deep draft ships by an abandoned causeway project that was attempting to join the large island in the northeast arm of the Inner Sea with the island just east of Rufflehome ( 33x, 22y). It is possible for shallow draft boats (rowboats and sailboats) to pass over this underwater causeway, larger boats will get bogged down. https://drive.google.com/open?id=1j3vu0SLTOuMl7q9SIqHVLKfqZvKkBR9z To travel north or south through this region, take the Pickle Island canal that passes between the islands that were once Pickle Island. For more details, consult the Albia Roads Map of Indy in this forum for details of the area. Skyefox & Hughmongus Co-cartographers of the Albia Roads Map of Indy
- 4 replies
-
- 2
-
- ship travel
- travel
-
(and 2 more)
Tagged with:
-
I'm building a canal and came across some agitating rock. After lowering the rock, it doesn't appear that its maximum depth meets the depth requirements for larger ships. The folks in GA - Freedom suggested the sculpting wand, but I don't believe anyone in the Pristine/Release cluster has one, and it also seems a bit silly to have to purchase charges on the wand just to lower the rock one or two extra dirt to grant passage for larger ships (based on some bad luck). I wasn't sure whether this should be posted in suggestions or bugs, so apologies if this is the wrong forum section. Here's a screenshot of the issue. I made a strip of land at the same level that surface mining forces me to stop lowering at. The sand is 3 tiles across, 2 tiles deep, all flat (same height as the lowered rock). On either side it slopes into deeper terrain; needless to say, the corbita wont traverse over the land. After testing a bit it's either a 1 or 2-dirt difference from allowing the corbita to travel across it. It seems like this would be an easy fix by either reducing ship depth requirement on larger rigs, or to allow surface mining to continue a few dirt deeper. Is this an intended mechanic/prevention? It's a killer for my canal project.
- 8 replies
-
- surface mining
- restriction
-
(and 4 more)
Tagged with: