Search the Community

Showing results for tags 'its done!'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Official Buildings
    • GM Hall
    • City Hall
    • Game News
    • Public Test Board
  • Back Streets
    • Town Square
    • Community Assistance
    • Village Recruitment Center
    • Suggestions & Ideas
    • The Creative Commons
    • Wood Scraps
  • Northern Freedom Isles
    • Harmony
    • Melody
    • Cadence
    • Northern Freedom Isles Market
  • Southern Freedom Isles
    • Celebration
    • Deliverance
    • Exodus
    • Independence
    • Pristine
    • Release
    • Xanadu
    • Southern Freedom Isles Market
  • Maintenance Buildings
    • Technical Issues
    • Server Bugs
    • Client Bugs
    • Model and Sound Bugs
    • Other Bugs and Issues
    • Wurmpedia / Wiki Maintenance
  • Wurm Unlimited
    • Unlimited Discussion
    • Unlimited Modding
    • Server Listings & Advertisement
    • Technical Issues

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Chaos


Independence


Deliverance


Exodus


Celebration


Xanadu


Release


Pristine


Epic


Cadence


Defiance


Harmony


Melody


Acc1


Acc2


Acc3

Found 1 result

  1. Dear Xanadians! (and everyone else reading this) We have created a fully fledged connection between the mainland and Newspring. Starting now, you can send your wagoneers and find your way to Newspring (and vice versa) in style. I introduce to you: the Newspring Connection Highway. The highway connects the main highway system built in these areas by Harthim to the the absolutely stunning bridge system made by Shmeric: Key Facts: 887 tiles (3.55 Km) long Broken ground: November 27th, 2016 - Finished: February 4th, 2018 Materials needed: far too many to count, in bricks alone estimated 29k, dirt well over 50k 130 tile long, 3 wide tunnel 3 bridges, two of which maximum length (38 tiles) and witdth (3 tiles) This highway was designed based on a philosophy: making travel as fast as possible. Because no other highway design would have been appropriate to connect into the majestic Newspring Bridge. That is the reason why this highway is (perhaps) one of the most advanced highways in wurm, with maximum slopes of 5 (except for a single 25 tile section of 15 slopes), using bridges over valleys, tunnels through mountains and carved passes - making up for some beautiful scenery along the way. However this would have not been possible without an amazing team: Shmeric Naiani Gheen Rockshadow Inspira Harthim Cevanne Ketha Jacobsilver The Anonymous Donators (people that did not want recognition, but should be recognized) Below you can find a few screenshots grouped on some of the highway's features. But if you are in the neighborhood, you should definitely go and check it out! The main highway connection Thunderstorm Expressway Valley and bridge Resilience Pass The Defiant Connection Golden Mt. Passage Wombat Way Newspring Bridge Connection I wish you safe travels and good fortune! All the best, Thor