  1. Hi, I can take care of the collapsing and making a new entrance when it comes to that, its just that my nahjo priest isn't

    premium atm, and i'd like to have a couple of more tasks for him before i spend the silvers on it.


  2. I did some work on the eastern entrance a few weeks ago.

    The lava did not seem to cool down, so I collapsed a few tiles and surfacemined it down, and then moved the entrance back a couple of tiles.

    I was able to mine out one of the 3 opening tiles, but the other 2 gave the 'Unstable...' message, have not tried again after the last server restart.


  3. On 3/3/2018 at 3:07 PM, Snowtech said:

    The tunnel from 4830, -4775 to 3290, -4770 is now two tiles wide and passable with knarrs and smaller boats.

    Can you please rename it to:  East Hammer Lake canal.

     

    Still only shows half of the tunnel.


  4. 2 hours ago, jackjones said:

    The tunnel from 4830, -4775 to 3290, -4770 is now two tiles wide and passable with knarrs and smaller boats.

    Can you please rename it to:  East Hammer Lake canal.

     

    Hm, doesn't seem like the update of the name and end points of the canal worked.


  5. Maybe the Mole Senses spell could be used for this?

    Make it castable on a wall and let it show the distance and height difference to openings ahead.

     

    Or it could be part of the analyse function.


  6. On 12.9.2017 at 8:24 PM, Snowtech said:

    I have started a new tunnel...

     

    4830, -4775 to 4318, -4775 so far,

    also made a connection to a small lake 4336, -4775 to 4336, -4752

     

    East entrance is 3 tiles wide, full depth, but the tunnel is only 1 tile wide, shallow depth and goes around some veins.

     

     

     

    4830, -4775 to 3290, -4770

    This tunnel is now possible to pass with knarrs and smaller boats. 

    (except for random cave ins when they happen)


  7. Tunnel started / work in progress

     

    I'm working on a tunnel between Hammer Lake and the lake to the east, currently about 950 tiles long starting at M18.

    Single tile width, knarr-depth and lots of veins in the path so far.

    Also made a connection to the small lake at M17.

     

     


  8. I have started a new tunnel...

     

    4830, -4775 to 4318, -4775 so far,

    also made a connection to a small lake 4336, -4775 to 4336, -4752

     

    East entrance is 3 tiles wide, full depth, but the tunnel is only 1 tile wide, shallow depth and goes around some veins.