Snowtech

Members
  • Content Count

    130
  • Joined

  • Last visited

Everything posted by Snowtech

  1. Understanding slopes, how to flatten a tile and what the different event messages related to digging/leveling means would be very useful.
  2. Surface mining was changed not too long ago, used to be a flat 1/5 chance. From wiki: The chance for a surface mining action to lower the rock is related to skill, with a minimum chance of 20%, and a maximum of 50% at 100 skill.
  3. Please add a highway/tunnel from 5732,-6389 to 5732,-6079
  4. So sad.. Rest in peace Tich, and thank you for everything you gave us.
  5. 20 below water for the larger ships, but max depth makes it nice and flat
  6. You can mine down under water deep enough for all ships.
  7. Hi, I can take care of the collapsing and making a new entrance when it comes to that, its just that my nahjo priest isn't premium atm, and i'd like to have a couple of more tasks for him before i spend the silvers on it.
  8. I did some work on the eastern entrance a few weeks ago. The lava did not seem to cool down, so I collapsed a few tiles and surfacemined it down, and then moved the entrance back a couple of tiles. I was able to mine out one of the 3 opening tiles, but the other 2 gave the 'Unstable...' message, have not tried again after the last server restart.
  9. Hi, I'll buy the drake hide lot for 23s Please CoD to Snowtech.
  10. sold

    Hi, please COD to Snowtech.
  11. Still only shows half of the tunnel.
  12. Rift 19.5

    Have some problems making the image show after the forum upgrade. (or i forgot how to paste a link...) https://imgur.com/a/uIb9okV
  13. Hm, doesn't seem like the update of the name and end points of the canal worked.
  14. Holding ctrl while moving will align to small grids, holding alt while moving will move in larger grids
  15. Maybe the Mole Senses spell could be used for this? Make it castable on a wall and let it show the distance and height difference to openings ahead. Or it could be part of the analyse function.
  16. The tunnel from 4830, -4775 to 3290, -4770 is now two tiles wide and passable with knarrs and smaller boats. Can you please rename it to: East Hammer Lake canal.
  17. 4830, -4775 to 3290, -4770 This tunnel is now possible to pass with knarrs and smaller boats. (except for random cave ins when they happen)
  18. Tunnel started / work in progress I'm working on a tunnel between Hammer Lake and the lake to the east, currently about 950 tiles long starting at M18. Single tile width, knarr-depth and lots of veins in the path so far. Also made a connection to the small lake at M17.
  19. I have started a new tunnel... 4830, -4775 to 4318, -4775 so far, also made a connection to a small lake 4336, -4775 to 4336, -4752 East entrance is 3 tiles wide, full depth, but the tunnel is only 1 tile wide, shallow depth and goes around some veins.
  20. well, i thought that the smiley showed that i didn't mean it literally.
  21. ToolAdvice

    Hi, Made a little tool to suggest what tool QL you should use for skilling. Tool ql is calculated from this formula: QL=(difficulty+20)*2-skill Click the SoT checkbox to toggle Stay on Top https://drive.google.com/drive/folders/0B7HBjJ040pYiamhPbjJoeGVfaVU?resourcekey=0-Zqn3y27a798kSbbHmQu55A&usp=sharing