Sign in to follow this  
Baloo

[No Bug] New Timber Framed Walls - excess beams required

Recommended Posts

Hi,

 

I just built the left and right timber framed walls; and found that each required 6 beams, rather than the normal 5 for other timber framed walls.

 

Yes, you need a beam in inventory to build one of these walls, and then another 4, not 5 more, to continue.

 

Suggestion:  Could the Devs please look at this and fix the new walls to be consistent with the rest of the white timber framed walls ?

 

Thanks, in hope....

 

Edit: and while the Devs are about it, could the grass required - 10 per wall, all be used each time, sometimes there is 1 or 5 or 2 left over.

Share this post


Link to post
Share on other sites

I feel it is intended - the other half arches now need a fence bar too

Share this post


Link to post
Share on other sites

well it should not be intended, as 5 beams for an arched wall is excessive enough already !

 

Share this post


Link to post
Share on other sites

No bug.  As Jaz mentioned, if you look at the new left, right and T arches for all other types of material you will see that they all require an additional 'support' item.  In the case of timber framed houses, that item is a support beam.

Share this post


Link to post
Share on other sites
Guest
This topic is now closed to further replies.
Sign in to follow this