Theonis

Deli Public Notice: More Highway Work

4 posts in this topic

Posted (edited)

Greetings to all my Deliverance residance.  Your local highway building posting up here as a heads up.  There is a highway that heads past shark lake, it squeezes down into 1 tile wide in an area I call the bowl.  I have lost much skill there due to the mobs, but that is beside the point.  I have plans and have come to the conclusion to cause as little disturbance to other roads there I am going to at least upgrade to two tiles wide on the north and south portion of my planned work.  The east and west portion will be three tiles wide while keeping my calling card highway pattern.  There may be some disruption to the flow of traffic as this will not be a project that will be done in a few days.  I think i will need two months on it as it will requiring surface mining. 

 

I have marked in the yellow the portion of the road I am upgrading.  The white line is the current road it self and i will be following that path.  I have no intention of changing its current path, I only marked in yellow to show which portion I will be working on.  I will be leveling, widening, and adding road art basically.  This is located at M 20 using the community map and R 17 using the in game map.

 

Road%20work.png

 

There are no other deeds near this area for I have looked in the area.  If some one is intrested in helping, pleaes cntact me for the plans I have, my highways are bit of a high standard when I make them.  See link for an example.

 

Edited by Theonis
3 people like this

Share this post


Link to post
Share on other sites

as long as its not damaging the amazing view from my new deed SouthWest Mountain of SharkLake... :)

 

Share this post


Link to post
Share on other sites

It shouldn't change any thing at all, as I had started it years ago and never finished it as some one put a deed over the work while I was in the middle of it.

1 person likes this

Share this post


Link to post
Share on other sites

I have started Theonis' planned improvements to the Shark Lake road and the project is progressing well. Most of the major surface mining is complete and the road is currently being raised to eliminate some ups and downs.  There is a small problem area in the middle but that will hopefully be resolved soon if someone can assist me in the enchanting of transmutation liquid.

 

adyi34.jpg

1 person likes this

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now